PM3 upgrade makes exciting progress at Lucca Paper Mill

At DS Smith, we are thrilled to share the latest advancements from our new paper machine (PM3) - one of the most significant investments in our company’s history. This major upgrade at our Lucca Paper Mill marks a pivotal step in our ongoing commitment to innovation, sustainability, and long- term growth.

Our investment in PM3 is strategically designed to meet the rising demand for high-performance packaging papers while enhancing energy efficiency and reducing CO₂ emissions. Modernising our operations not only enhances product quality but also optimises resource usage, reinforcing our position as a leader in sustainable packaging solutions.  

The journey towards this transformation is well underway, and we are excited about the benefits it will bring to our customers and the environment alike. 

ANDRITZ FiberFlow Drum installation: A Monumental Achievement 

On December 13, we celebrated a significant milestone with the successful lifting of the new Drum Pulper, a crucial component for the OCC area that will support PM3. This impressive piece of equipment, supplied by ANDRITZ, is fundamental to our efficient raw material processing.  

Weighing in at 235 tonnes, measuring 48 metres in length, and boasting a diameter ranging from 4.5 to 5.6 metres, it is the largest of its type. The Drum Pulper is powered by two electric motors, each with a capacity of 1000 KW. Once fully operational, it will have the capability to produce up to 1650 tonnes of stock each day, ensuring that we operate efficiently and sustainably. 

The journey of the Drum Pulper has been remarkable. Manufactured at ANDRITZ China, it took approximately six months to build before embarking on an extensive journey, including a 10-week sea voyage to Livorno Port, just 50 kilometres from our mill. After navigating a meticulous transport process, with the last section arriving on 1st October, it underwent three months of assembly before taking its proud place at PM3. 

 

The big lift of the Drum Pulper is a major milestone, not only for the stock preparation project at DS Smith, but also as the 300th Drum Pulper delivered by ANDRITZ. We are confident that the new line will set new standards in recycled fibre processing.

Helmuth Stoni
Senior Project Manager at ANDRITZ

 

Valmet Maintenance Agreement: Strengthening Our Future 

We are also pleased to announce a critical partnership with Valmet through a three-year maintenance agreement, designed to support PM3’s startup and bolster the development of our local maintenance teams. This collaboration signifies our unwavering commitment to operational excellence and continuous improvement. 

To commemorate this partnership, we held a signing event—a moment of significance for all participants. With Valmet’s world-class maintenance expertise now at our disposal, we are excited to foster skill development, ensuring PM3 functions at its peak for years to come. 

 

From the meticulous planning and logistics to the seamless execution and implementation, this journey has been powered by the passion and commitment of our people. We extend our heartfelt gratitude to everyone involved in bringing these milestones to life.

Alessandro Romagnolo
Head of Project PM3